Case Study Management requested an expansion of the model in part (2) that

Case Study Management requested an expansion of the model in part (2) that would provide a better balance between the total time on lirne 1 & the total time on line 2. Management wants to limit. the difference between the total time on line 1 & the total time on line 2 to 30 minutes or less. If the objective is still to maximize the total contribution to profit, how many units of each printer should be produced? What effect does this workload balancing have on total profit in part (2)?